Avatar

Bastian Körber

  • Total activity 77
  • Last activity
  • Member since
  • Following 0 users
  • Followed by 0 users
  • Votes 5
  • Subscriptions 62

Activity overview

Latest activity by Bastian Körber
  • Bastian Körber created an article,

    Third Party Licenses

    Apache 2.0 Library Author Link Selenium authors Source Log4Net   Source Bouncy Castle Bouncy Castle Inc. Source AvalonWizard   Source Reactive Extensions   Source Castle.Core Opens...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Bastian Körber created an article,

    Architectural Overview

    The AM Ensemble consists of several components used to kickstart your enterprise automation journey. Integral components are: AM Muse AM Composer AM Conductor AM Console Our architecture is based...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Bastian Körber created an article,

    Maintenance

    Should changes occur in any underlying software agents, such as a change in a UI, the entire bot does not need to be rewritten. This is a unique feature of our architecture and solutions. Instead, ...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Bastian Körber created an article,

    Go-Live

    All testing is now completed and the bot has successfully performed all tests. It is now ready to go live and is officially handed over to the process owner. During this phase of the deployment, th...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Bastian Körber created an article,

    Get Well

    During the Get Well phase, we increase the ticket volume to validate that the system is running as desired and verify we can reach the desired success rate. Logs, screenshots and reports will also ...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Bastian Körber created an article,

    Testing/ Rollout

    Once the process script is completed, it must be tested and implemented. During this step, we will install all components of Another Monday’s production environment. This creates a live instance of...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Bastian Körber created an article,

    Implementation

    During the Implementation Phase, the output of the AM Muse is finalized, and any additional programming steps are completed by a Developer or Analyst. Given the nature of the tasks, Developers/Anal...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Bastian Körber created an article,

    Identification

    During the process identification phase, there are several methods for reaching the target of process identification. Another Monday provides different support options, and you can review our RPA P...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Bastian Körber created an article,

    Analysis

    During the analysis phase we create detailed “Click Diagrams” of the automation task. Our Business Analysts use two of our tools to produce this documentation: The AM Muse© and the AM Composer©. Wo...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Bastian Körber created an article,

    Evaluation

    During the evaluation phase, we determine which type of RPA automation to implement: RDA, RPA, or a hybrid solution of both. We then construct a business case that includes the predicted economic b...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes